Project
Newham, East London
The goal was to implement a damper control system to manage 128 x FSD’s across two floors and within six fire zones, with an emphasis on a tight delivery schedule.
The original plan to use 3 x EM50 electro-mechanical control panels was modified due to site logistics and strategy requirements. A centralised control panel system on each floor was devised to power the dampers and offer individual control, compatible with the pre-wired EM system and 24v actuators.
A hybrid ACP/EM control system was introduced with ADM panels on each floor, connecting to the main ACP200 that would facilitate the overarching C&E strategy and control.
Equipment Used:
All equipment was delivered on schedule. Accommodations to the project were made by BSB such as; commissioning being moved to after-hours to enable air balancing requirements and several wiring changes were resolved through collaboration between BSB engineers and on-site electricians, resulting in all project goals being met.
128
Motorised Fire Dampers
1
Addressable Damper Control Panel
4
Damper Module Panels